Industry Applications
Gechuang Dongzhi Material Box Warehouse
2024-10-24
|
Main parameters ● X-Speed horizontal running speed: 330m/min ● X-Acceleration horizontal acceleration: 3.0m/s² ● Y-Speed vertical running speed: 120m/min ● Y-Acceleration vertical acceleration: 2.0m/s² ● Z-Speed running speed: 45m/min (full load) - 90m/min (empty load) ● Z-Acceleration acceleration: 1.0-3.0m/s² ● Height : 15m ● Tunnel length: 61.8m |
![]() |
Configuration Scheme

Project Highlights
● The miniload stacker in this project has the same configuration as Changzhou Bosch, and the storage and retrieval speed reaches 240/H/each.
● The stacker uses a synchronous belt structure for both walking and lifting, which ensures maximum acceleration while taking into account high stopping accuracy.
Integrated solution for automated logistics system
Building 8, 1999 Jinfeng South Road, Mudu Town, Wuzhong District, Suzhou City
