Industry Applications
Northern Machinery and Electronics Saudi Arabia Logistics Distribution Center
2024-10-24
|
Main parameters X-Speed horizontal running speed: 140m/min X-Acceleration horizontal acceleration: 0.33m/s² Y-Speed vertical running speed: 30m/min Y-Acceleration vertical acceleration: 0.40m/s² Z-Speed fork running speed: 40m/min (full load) - 60m/min (empty load) Z-Acceleration fork acceleration: 0.4m/s² Height: 6.5m Tunnel length: 27m |
![]() |
Configuration Scheme

Project Highlights
The customer's floor layout is a three-story structure. Based on its unreasonable layout, the overall operating efficiency of the customer has been improved by about 30% compared with the expected through the solution design.
It saves a lot of labor demand for the customer.
Previous:
Integrated solution for automated logistics system
Building 8, 1999 Jinfeng South Road, Mudu Town, Wuzhong District, Suzhou City
