Industry Applications

Northern Machinery and Electronics Saudi Arabia Logistics Distribution Center

2024-10-24

Main parameters

X-Speed ​​horizontal running speed: 140m/min

X-Acceleration horizontal acceleration: 0.33m/s²

Y-Speed ​​vertical running speed: 30m/min

Y-Acceleration vertical acceleration: 0.40m/s²

Z-Speed ​​fork running speed: 40m/min (full load) - 60m/min (empty load)

Z-Acceleration fork acceleration: 0.4m/s²

Height: 6.5m

Tunnel length: 27m

 

Configuration Scheme

 

 

Project Highlights

The customer's floor layout is a three-story structure. Based on its unreasonable layout, the overall operating efficiency of the customer has been improved by about 30% compared with the expected through the solution design.

It saves a lot of labor demand for the customer.