Changzhou Bosch Box Warehouse
2024-10-24
|
Main parameters ● X-Speed horizontal running speed: 330m/min ● X-Acceleration Horizontal acceleration: 3.0m/s² ● Y-Speed vertical running speed: 120m/min ● Y-Acceleration Vertical acceleration: 2.0m/s² ● Z-Speed operating speed: 45m/min (full load) - 90m/min (no load) ● Z-Acceleration: 1.0-3.0m/s² ● Height :13.6m ● Tunnel length :45m |
![]() |
Configuration Scheme

Project Highlights
● In this project, the miniload stacker’s speed reaches a domestic top level, unparalleled in the industry, with an inbound and outbound rate of 240/H per unit.
● Both the walking and lifting mechanisms of the stacker crane use synchronous belt structures, ensuring maximized acceleration while maintaining high stopping accuracy.
Integrated solution for automated logistics system