Industry Applications
FAW Hongqi Manufacturing Center, Changchun
2024-10-24
|
Main parameters ● X-Speed horizontal running speed: 120m/min ● X-Acceleration Horizontal acceleration: 0.3m/s² ● Y-Speed vertical running speed: 30m/min ● Y-Acceleration Vertical acceleration: 0.3m/s² ● Z-Speed Fork running speed: 45m/min (full load) - 90m/min (no load) ● Z-Acceleration Fork acceleration: 0.3-1.5m/s² ● Height :10m ● Tunnel length :50m |
![]() |
Configuration Scheme

Project Highlights
● The factory comprises five workshops: stamping, welding, painting, final assembly, and battery & electric drive. The stamping production line boasts a full-process automation rate of 71.4%.
● Based on project needs, two heavy-duty stacker cranes are provided to achieve automatic feeding at the stamping line head, perfectly interfacing with AGV and RGV vehicles to efficiently fulfill inbound and outbound tasks. This supports the automation of the stamping production line and the efficient utilization of workshop space.
● Four forks accommodate the inbound and outbound tasks of one large pallet, two small pallets, or a single small pallet.
Integrated solution for automated logistics system
Building 8, 1999 Jinfeng South Road, Mudu Town, Wuzhong District, Suzhou City
