Industry Applications

SAIC Volkswagen Jiading MEB Parts Center, Shanghai

2024-10-24

Main parameters

● X-Speed ​​horizontal running speed: 200m/min

● X-Acceleration Horizontal acceleration: 0.5m/s²

● Y-Speed ​​vertical running speed: 45m/min

● Y-Acceleration Vertical acceleration: 0.5m/s²

● Z-Speed ​​Fork running speed: 30m/min (full load) - 45m/min (no load)

● Z-Acceleration Fork acceleration: 0.3-0.5m/s²

● Height :19.5m

● Tunnel length:77m

 

Configuration Scheme

 

Project Highlights

The client handles a wide variety of goods with frequent picking and inventory checking needs. Through reasonable layout planning and software system matching, these client needs are perfectly addressed.

The stacker crane's main control system uses an air-conditioned electrical cabinet, ensuring smooth operation of the equipment during hot summer temperatures and 24/7 continuous operation.

The cycle time exceeds the client's requirements by 20%, avoiding secondary construction and investment when the client suddenly increases flow requirements.

The system operates stably and smoothly, ensuring good equipment lifespan and utilization rates.

The Siemens asynchronous servo system ensures minimal shaking of the stacker crane during high-speed operation, reducing fault rates and increasing equipment lifespan.