Industry Applications

SAIC Volkswagen Jiading MEB Parts Center, Shanghai

2024-10-24

Main parameters

● X-Speed ​​horizontal running speed: 200m/min

● X-Acceleration Horizontal acceleration: 0.5m/s²

● Y-Speed ​​vertical running speed: 45m/min

● Y-Acceleration Vertical acceleration: 0.5m/s²

● Z-Speed ​​Fork running speed: 30m/min (full load) - 45m/min (no load)

● Z-Acceleration Fork acceleration: 0.3-0.5m/s²

● Height :19.5m

● Tunnel length:77m

 

Configuration Scheme

 

Project Highlights

● The client handles a wide variety of goods with frequent picking and inventory checking needs. Through reasonable layout planning and software system matching, these client needs are perfectly addressed.

● The stacker crane's main control system uses an air-conditioned electrical cabinet, ensuring smooth operation of the equipment during hot summer temperatures and 24/7 continuous operation.

● The cycle time exceeds the client's requirements by 20%, avoiding secondary construction and investment when the client suddenly increases flow requirements.

● The system operates stably and smoothly, ensuring good equipment lifespan and utilization rates.

● The Siemens asynchronous servo system ensures minimal shaking of the stacker crane during high-speed operation, reducing fault rates and increasing equipment lifespan.